« back to gallery

Keeping Track

Deep Cleaning Gang employed by a sub-contractor working through the night at Edgware Road tube station on the Bakerloo Line.  The track in the station and 50 metres into each tunnel are cleaned every two weeks to prevent fire and smouldering of accumulated debris, which can result in costly line closures.

Deep Cleaning Gang employed by a sub-contractor working through the night at Edgware Road tube station on the Bakerloo Line. The track in the station and 50 metres into each tunnel are cleaned every two weeks to prevent fire and smouldering of accumulated debris, which can result in costly line closures.

Filename: 1005TfL54.jpg
Size: 4256x2832 / 2.5MB
From gallery: Keeping Track
Source:
Date: 27 May 2010
Location:
Credit: © Philip Wolmuth
Copyright:
Model Release: No
Property Release: No
Restrictions:
Direct Link:
Keywords: