« back to gallery

Working Lives

Adam Duff has run Adam Engineering from an arch of the Kentish Town Road railway bridge for more than 20 years.  The workshop will be inaccessible for three and a half years if current plans to widen and strengthen the bridge for the HS2 high speed rail line go ahead.

Adam Duff has run Adam Engineering from an arch of the Kentish Town Road railway bridge for more than 20 years. The workshop will be inaccessible for three and a half years if current plans to widen and strengthen the bridge for the HS2 high speed rail line go ahead.

Filename: 1312_HS2_182.jpg
Size: 3264x4896 / 3.5MB
From gallery: Working Lives
Source:
Date: 13 Dec 2013
Location:
Credit:
Copyright:
Model Release: No
Property Release: No
Restrictions:
Direct Link:
Keywords: